Lead
partner | DeliverablesOnce ready and approved most of the deliverables of WP1-6 will be made available from this table. If in doubt, read the DOW. |
8 | D1.1 Month 12. At month 12 the complete SSP framework will be ready with most databases and software incorporated (albeit probably not all functional yet) |
8 | D1.2 Month 24. At month 24 all facilities will be in place for
all partners to get frequent updates of the whole SSP, including all facilities. |
5 | D1.3 Month 24. Demonstration of SSP use by YAS products;
and a report about their software activities required to achieve that interactivity. |
10 | D1.4 Month 36. Demonstration of SSP integration with BIOP's
information system; and a report about their software activities required to achieve that integration. |
1 | D1.5 Month 48. After month 24 existing facilities will
continuously be improved, and new facilities added as a result of the experimental validation and the
interactions with users. New or improved facilities will be available for use and download
immediately after they are finished. Software reports will all be up-to-date. |
1 | D2.1. Month 18. All presently existing databases available
at SSP (with MRS search engine). |
2 | D2.2. Month 24. Sequence mutation and variant database(s)
available at SSP. |
1 | D2.3. Month 48. All databases available at SSP and query,
browse, retrieval, and inferencing facilities all in place, operational, and thoroughly checked. |
1 | D3.1. Month 18. Connection to PMP homology modelling portal in place. |
5 | D3.2. Month 18. YASARA_VIEW scripts available for a series of key outputs. |
1 | D3.3. Month 18. MRS fully installed and interoperable with PMP, and WHAT IF. |
1 | D3.4. Month 24. Most relevant WHAT IF options accessible from SSP |
1 | D3.5. Month 36. HOPE molecular spreadsheet software operational and integrated |
1 | D3.6. Month 48. All software available interactively, and for
downloading. SSP 'ready'. |
1 | D4.1 Month 12. HSSP updated with new improved, and calibrated alignment software. |
1 | D4.2 Month 24. A HSSP visual interface that provides tools
to visualise variability and conservation. |
1 | D4.3 Month 36. HSSP interface extended with visualisation
options for a) correlated mutations; b) multimer- and crystal-contacts; and c) observed or
predicted ligand binding contacts. |
5 | D5.1 Month 12. YASARA View scripts in place for a few options (Task 1) |
5 | D5.2 Month 24. YASARA View scripts in place for all options
mentioned in all WPs (Task 1) |
5 | D5.3 Month 48. YASARA View plug-in in place to use SSP
functionality directly (Task 2). |
2 | D6.1 Month 12. Validation report describing experiments in the first year. |
2 | D6.2 Month 24. Validation report describing experiments in the second year. |
2 | D6.3 Month 36. Validation report describing experiments in the third year. |
2 | D6.4 Month 48. Validation report describing experiments in the last year. |
1 | D7.1 Financial reports to the Commission(every 12 months) |
1 | D7.2 Scientific reports to the Commission (every 12 months)
|
1 | D7.3 Consortium meetings, including kick-off meeting (every 12 months) |
1 | D7.4 Month 1. Consortium agreement |